M53 Moreton North Bridge Demolition

Civil Structural Temporary Works

The M53 Moreton North Bridge carries the Junction 2 southbound slip road (Chester bound) over the main motorway. Recent bridge assessments had recommended a weight restriction be applied to the bridge which would restrict HGV use. Highways England therefore planned for its replacement. The presence of asbestos permanent formwork cast…

Pooley Bridge Gets Its Bridge Back

Civil Earth Structures Geotechnical Structural Temporary Works

On December the 6th 2015, during storm Desmond, substantial flooding in Cumbria resulted in the loss of the masonry arch bridge within the village of Pooley Bridge. The original bridge was erected in 1764 (itself replacing an earlier bridge from the 16th century) and was positioned at the outlet of…

A57 Hyde Road Widening Works to Ease Congestion

Civil Earth Structures Featured Geotechnical Structural Temporary Works

The A57 Hyde Road forms part of the main arterial route network into Manchester City Centre. The trunk road is a link between the junctions of the M60 and M67 motorways at the east end, and the Ardwick Green South (A6) at the west end. For the majority of its…

New Gas Bag for Southport WwTW

Civil Geotechnical Structural

As part of United Utilities improvements to Southport WwTW a new state of the art gas bag retention system has been installed to replace the traditional gas holders. Methane produced from sludge treatment will be stored in the bag and this gas will then be turned into electricity to help…

Dukinfield Waste Water Treatment Works – Nitrifying Trickling Filter

Civil Geotechnical Structural

PaSCoE were commissioned to design the civils structures associated with the construction of a new Nitrifying Trickling Filter (NTF) to supplement an existing bank of NTF’s supplied by a single distribution chamber. The works included the design and detailing of piled foundations for the new post tensioned precast segmental tank…

New Culvert Reinstates RA Rating for the Welshpool to Aberystwyth Line

Civil Railways Structural Temporary Works

As part of the Wales Package 7 contract, a number of structures along the Welshpool to Aberystwyth line did not have the Rail Availability (RA) rating for the line. In order to achieve the RA rating for the Greenhouse Underbridge it was agreed that the superstructure to the bridge would…

Stockley Airport Junction – New Relief Lines to Heathrow

Civil Railways Structural Temporary Works

For the past 18months the Crossrail West, Stockley Airport Junction project has provided a constant source of opportunities for PaSCoE to prove our ability to develop strong working relationship as well as demonstrate our unique, adaptive and client focused approach to temporary works design. Due to increased demand on rail…

Cambrian Quarry – New life for former ‘Vim’ quarry

Civil Earth Structures Geotechnical

The geology to the west of Mold in North Wales has a long history of extractive industries. Mineralised veins within the rocks have been mined for lead, and mine voids have been used for drainage and storage, including munitions and explosives. At Cambrian Quarry in Gwernymynydd, underground workings extracted the…

Ben Gill, Cumbria – Back to Nature

Civil Earth Structures Geotechnical Structural

Engineering work on the weir of Ennerdale Water in the 1950s raised the level of the lake, increasing its storage capacity and ensuring a more secure potable water supply. As part of this work, one of the tributaries of the River Ehen (Ben Gill) was diverted to Ennerdale Water via…

Sustainable Urban Drainage – Innovative underground storage solution

Civil Geotechnical Structural

Working in partnership with Stormwater Management Ltd we have provided the technical support to assist in the design and construct an innovative sustainable urban drainage system – the Elevator attenuation storage tank. The unique uPVC permanent formwork solution creates an innovative means of economising material needs whilst achieving excellent structural…

14m high wall supports the flow of electricity from Scotland to England

Civil Earth Structures Geotechnical Structural

As part of the major FACTS (Flexible Alternating Current Transmission System) project by National Grid to boost the flow of electricity from Scotland to England cutting edge design TCSC (thyristor controlled series compensation) equipment was required at the Hutton 400 kV Hutton Substation near Kendal in Cumbria. This exciting project…

800 year old Kirkstall Forge gets a new lease of life

Civil Earth Structures Geotechnical Structural

A historic part of Leeds is being given a new lease of life as Kirkstall Forge is set kick start the regeneration of the area. For over 800 years Kirkstall Forge has been a vital part of Leeds’ industrial heritage, with this part of the city forging metal since 1147…

Hayeswater Reservoir returned to a natural tarn

Civil Geotechnical

After more than 100 years of public service Hayeswater Reservoir has been restored to the natural mountain tarn it once was. Dammed in 1908 to provide drinking water to communities around Ullswater the reservoir was declared surplus to requirements in 2005. The project team of United Utilities, PaSCoE, and Eric…

A27/A270 Junction Improvements Brighton

Civil Earth Structures Featured Geotechnical Structural

To support the construction of a new Community Stadium and new building works by the University of Brighton the existing road network required major improvements to interface with the existing and proposed infrastructure. The new Brighton and Hove Albion Stadium Project required improvements to the A270 Lewes Road which included…

Thameslink Tight Squeeze

Civil Geotechnical Railways Temporary Works

The £6bn Thameslink Programme has now entered its second phase of project delivery. This monumental scheme, driven forward by the rapidly expanding demand for rail services is focused on transforming the Thameslink transport artery into a more accessible link through the heart of London The upgrade and expansion of the…

Ogden IR Advance

Civil Structural

Following flood studies and physical modelling it was determined that the existing Ogden Reservoir was unable to pass a Probable Maximum Flood (PMF). To accommodate the PMF event, the existing spillways and overflows needed improvement.  However to enable these improvements to be carried out, advanced works were required to divert…

Asda Rochdale

Civil Earth Structures Geotechnical

When ASDA opted to construct a new distribution warehouse in Rochdale a site was identified close to the M62, overlooking a number of residential properties. The site was heavily sloping and a cut and fill exercise highlighted the need for a 4-5m high retaining structure to support the lorry access…

Milwr Tunnel

Civil Structural Temporary Works

Milwr Tunnel is a mine drainage adit extending 10 miles from Cadole near Loggerheads, Denbighshire to Bagillt on the Dee Estuary in North Wales. The tunnel outfall is located approximately 100m inland from the banks of the River Dee and water flows to the Dee via a 18m wide 6m…

Holden Wood IR

Civil Earth Structures Featured Geotechnical Structural Temporary Works

Flood studies and physical model tests demonstrated that the existing overflow and spillway facilities at the Holden Wood Impounding Reservoir were unable to pass the Probable Maximum Flood (PMF) without overtopping onto the main earth embankment with a consequent risk of failure due to the destructive action of out-of-channel flows….

Allescholes Landslip Stabilisation Works

Civil Earth Structures Geotechnical

The existing embankment pre-failure comprised of a clay slope at an approximate inclination of 1:1.5, with a height of approximately 8m falling to a stream at the base of the slope. Road drainage was directed to a ditch at the side of the embankment falling to the stream at the…