On December the 6th 2015, during storm Desmond, substantial flooding in Cumbria resulted in the loss of the masonry arch bridge within the village of Pooley Bridge. The original bridge was erected in 1764 (itself replacing an earlier bridge from the 16th century) and was positioned at the outlet of… ∞
PaSCoE were commissioned to design the civils structures associated with the construction of a new Nitrifying Trickling Filter (NTF) to supplement an existing bank of NTF’s supplied by a single distribution chamber. The works included the design and detailing of piled foundations for the new post tensioned precast segmental tank… ∞
Engineering work on the weir of Ennerdale Water in the 1950s raised the level of the lake, increasing its storage capacity and ensuring a more secure potable water supply. As part of this work, one of the tributaries of the River Ehen (Ben Gill) was diverted to Ennerdale Water via… ∞
The £6bn Thameslink Programme has now entered its second phase of project delivery. This monumental scheme, driven forward by the rapidly expanding demand for rail services is focused on transforming the Thameslink transport artery into a more accessible link through the heart of London The upgrade and expansion of the… ∞
The project required the replacement of an existing siphon pipeline situated just under the surface of the upstream face, crest and downstream face of the Poaka Beck Impounding Reservoir Dam, near Ulverston, Cumbria. The siphon pipeline has a dual purpose, serving as the supply pipeline to Poaka Beck Water Treatment… ∞