Projects » Jacking

M53 Moreton North Bridge Demolition

Civil Structural Temporary Works

The M53 Moreton North Bridge carries the Junction 2 southbound slip road (Chester bound) over the main motorway. Recent bridge assessments had recommended a weight restriction be applied to the bridge which would restrict HGV use. Highways England therefore planned for its replacement. The presence of asbestos permanent formwork cast…

South Wales Re-Signalling Programme

Railways Structural Temporary Works

State-of-the art signalling technology is being installed in South Wales to allow more trains to run along the track and so increase passenger capacity, particularly at peak times. The works have included re-signalling the line in the area east of Port Talbot East, from Llantrisant to Baglan, the Newport area…

New Culvert Reinstates RA Rating for the Welshpool to Aberystwyth Line

Civil Railways Structural Temporary Works

As part of the Wales Package 7 contract, a number of structures along the Welshpool to Aberystwyth line did not have the Rail Availability (RA) rating for the line. In order to achieve the RA rating for the Greenhouse Underbridge it was agreed that the superstructure to the bridge would…

Tanners Hill

Geotechnical Railways Temporary Works

To improve capacity on the line between London Bridge and Lewisham, a new stretch of single track has been built alongside the original bi-directional single track between Tanners Hill Junction (near St John’s Station) and Lewisham Vale Junction. Before the new track was laid, St John’s Vale Road Bridge was…