Pooley Bridge Gets Its Bridge Back

Civil Earth Structures Geotechnical Structural Temporary Works

On December the 6th 2015, during storm Desmond, substantial flooding in Cumbria resulted in the loss of the masonry arch bridge within the village of Pooley Bridge. The original bridge was erected in 1764 (itself replacing an earlier bridge from the 16th century) and was positioned at the outlet of…

Eltham Embankment Stabilisation

Featured Geotechnical Railways Temporary Works

Evidence of both deep seated and shallow instability had been reported on the Down slope of the Eltham embankment located approximately 300m to the west of Eltham Station between Eltham and Kidbrooke stations at ELR: BEX 8m 61.5ch to 8m 70ch. Remedial works in the form of soil nailing, track…

Bookham Embankment Stabilisation

Earth Structures Geotechnical Railways Structural

Bookham embankment is located between Effingham Junction and Leatherhead Junction. A section of the line is built upon an embankment up to 5.5m high with a slope angle of 31°. The embankment was constructed mainly using remoulded soft clay, and a circular slip failure had resulted in movement of the…

Buttershaw School

Earth Structures Geotechnical

Buttershaw High school was included in Phase 1 of the Government ‘Building Schools for the Future’ programme. The scheme entailed the demolition of existing school buildings and the construction of a new school building, car parking and sports facilities. The school site was constructed over varied topography which required the…