Cambrian Quarry – New life for former ‘Vim’ quarry

Civil Earth Structures Geotechnical

The geology to the west of Mold in North Wales has a long history of extractive industries. Mineralised veins within the rocks have been mined for lead, and mine voids have been used for drainage and storage, including munitions and explosives. At Cambrian Quarry in Gwernymynydd, underground workings extracted the…

Eltham Embankment Stabilisation

Featured Geotechnical Railways Temporary Works

Evidence of both deep seated and shallow instability had been reported on the Down slope of the Eltham embankment located approximately 300m to the west of Eltham Station between Eltham and Kidbrooke stations at ELR: BEX 8m 61.5ch to 8m 70ch. Remedial works in the form of soil nailing, track…

Daniels Mill Slope Reconstruction

Earth Structures Geotechnical Temporary Works

Daniels Mill is a fully working watermill set in the idyllic Shropshire countryside, deep in a wooded steep valley crossed by the 19th century viaduct carrying the Severn Valley Railway to Bridgnorth. Its impressive waterwheel has been carefully restored to its former glory and is the largest waterwheel powering a…

Asda Rochdale

Civil Earth Structures Geotechnical

When ASDA opted to construct a new distribution warehouse in Rochdale a site was identified close to the M62, overlooking a number of residential properties. The site was heavily sloping and a cut and fill exercise highlighted the need for a 4-5m high retaining structure to support the lorry access…

Bookham Embankment Stabilisation

Earth Structures Geotechnical Railways Structural

Bookham embankment is located between Effingham Junction and Leatherhead Junction. A section of the line is built upon an embankment up to 5.5m high with a slope angle of 31°. The embankment was constructed mainly using remoulded soft clay, and a circular slip failure had resulted in movement of the…