As part of the Wales Package 7 contract, a number of structures along the Welshpool to Aberystwyth line did not have the Rail Availability (RA) rating for the line. In order to achieve the RA rating for the Greenhouse Underbridge it was agreed that the superstructure to the bridge would… ∞
The geology to the west of Mold in North Wales has a long history of extractive industries. Mineralised veins within the rocks have been mined for lead, and mine voids have been used for drainage and storage, including munitions and explosives. At Cambrian Quarry in Gwernymynydd, underground workings extracted the… ∞
Engineering work on the weir of Ennerdale Water in the 1950s raised the level of the lake, increasing its storage capacity and ensuring a more secure potable water supply. As part of this work, one of the tributaries of the River Ehen (Ben Gill) was diverted to Ennerdale Water via… ∞
Following flood studies and physical modelling it was determined that the existing Ogden Reservoir was unable to pass a Probable Maximum Flood (PMF). To accommodate the PMF event, the existing spillways and overflows needed improvement. However to enable these improvements to be carried out, advanced works were required to divert… ∞