01772 254322

P&S Consulting Engineers

mail@pascoe-ltd.co.uk|01772 254322

Projects » Bearing Capacity Analysis

Pooley Bridge Gets Its Bridge Back

Civil Earth Structures Geotechnical Structural Temporary Works

On December the 6th 2015, during storm Desmond, substantial flooding in Cumbria resulted in the loss of the masonry arch bridge within the village of Pooley Bridge. The original bridge was erected in 1764 (itself replacing an earlier bridge from the 16th century) and was positioned at the outlet of…

New Gas Bag for Southport WwTW

Civil Geotechnical Structural

As part of United Utilities improvements to Southport WwTW a new state of the art gas bag retention system has been installed to replace the traditional gas holders. Methane produced from sludge treatment will be stored in the bag and this gas will then be turned into electricity to help…

Ben Gill, Cumbria – Back to Nature

Civil Earth Structures Geotechnical Structural

Engineering work on the weir of Ennerdale Water in the 1950s raised the level of the lake, increasing its storage capacity and ensuring a more secure potable water supply. As part of this work, one of the tributaries of the River Ehen (Ben Gill) was diverted to Ennerdale Water via…

Sustainable Urban Drainage – Innovative underground storage solution

Civil Geotechnical Structural

Working in partnership with Stormwater Management Ltd we have provided the technical support to assist in the design and construct an innovative sustainable urban drainage system – the Elevator attenuation storage tank. The unique uPVC permanent formwork solution creates an innovative means of economising material needs whilst achieving excellent structural…

High Wycombe Rail Station – Works start on £4 million upgrade

Railways Structural Temporary Works

Improvement works have started at Chiltern Railways’ third busiest station, High Wycombe, as part of a £4 million Network Rail project which will see the lengthening of the northbound platforms and the construction of a footbridge. Network Rail and Chiltern Railways are undertaking the project to provide long term additional…

Thameslink Tight Squeeze

Civil Geotechnical Railways Temporary Works

The £6bn Thameslink Programme has now entered its second phase of project delivery. This monumental scheme, driven forward by the rapidly expanding demand for rail services is focused on transforming the Thameslink transport artery into a more accessible link through the heart of London The upgrade and expansion of the…

Abbey Area Regeneration – Bridge Lift

Railways Structural Temporary Works

To kick start the multi-million pound transformation of Abbey Road area in Kilburn, London a disused footbridge over the West Coast mainline needed to be removed. The 34m single span, steel truss bridge provided access between a local housing estate and a multi-story car park. However, since its construction, the…