01772 254322

P&S Consulting Engineers

mail@pascoe-ltd.co.uk|01772 254322

News » Newport and Penmaenmawr Stations – Bridge Lift

Working with Centregreat Rail Ltd PaSCoE has designed the safe removal of the redundant footbridge at Newport Station at part of the Great Western Route Electrification.

At Penmaenmawr Station the existing footbridge requires refurbishment, PaSCoE has designed the safe removal of the footbridge to allow for factory refurbishment and repair at Centregreat workshop. Works also included the design of a temporary Layher staircase to maintain access whilst footbridge is refurbished.

 

 

 

 

 

 

 

 

Comments

Filter by category